UNESCAP cooling towers were operated for a year using chemical dosing as the primary treatment. The chillers approach water temperature was found to be 8°C, indicating significant loss of efficiency generally attributed to fouling and scaling.
Project Details:
2013
4,000 TR
4
Project Results:
Background:
The cooling towers are operating eciently and without scaling, corrosion or bio-fouling.
Maintenance:
Maintenance is significantly reduced
Energy savings:
Chillers approach water temperature dropped from 8°C to 2.1°C, increasing the chillers efficiency by 9%